首页> 外文期刊>Materials Performance >Displacement of coke drums We have four coke i drums in our delayed
【24h】

Displacement of coke drums We have four coke i drums in our delayed

机译:焦炭鼓的排量我们有四个焦炭鼓

获取原文
获取原文并翻译 | 示例
           

摘要

These drums are 75 ft (23 m) in height and 26 ft (8"Htfm diameter and made of SA-387 Gr 11 with type 410 stainless steel (SS) (IMS S41000) cladding. The coke drum operation cycle is 40 h. The problem we are facing is the displacement of these drums from their original position by 1/2 to 3 in. (13 to 76 mm) along the direction of the overhead vapor line. Movement of the coke drum resulted in anchor bolt damage in the form of necking or even shearing off completely. We wish to know if anyone has experienced a similar problem. It sounds like a structural or geo-technical engineering issue regarding differential movement as ipposed to a corrosion issue.
机译:这些鼓的高度为75英尺(23 m),直径为26英尺(8“ Htfm),由SA-387 Gr 11制成,带有410型不锈钢(SS)(IMS S41000)包层。焦炭鼓的运行周期为40 h。我们面临的问题是这些鼓沿塔顶蒸气管线的方向从原始位置移位1/2到3英寸(13到76毫米),焦炭鼓的移动导致锚固螺栓损坏。我们希望知道是否有人遇到过类似的问题,这听起来像是结构或岩土工程方面的问题,原因是差速运动与腐蚀有关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号