...
首页> 外文期刊>McCloskey s Coal Report >Colombian ports to load directly
【24h】

Colombian ports to load directly

机译:哥伦比亚港口直接装载

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Colombian Ministry of Mines and Energy will set a deadline in less than a month, requiring all coal loading at export facilities to be done with direct loading and using covered conveyor belts from July 1 2010. Of the currently existing facilities, only Puerto Bolivar (Cerrejon's totally dedicated port) and Carbosan in Santa Marta load direcdy. The rest of the ports located in the adjoining cities of Cienaga and Santa Marta (where Drummond, Carbones del Caribe, Carbosan and Glencore/Prodeco's ports are located) as well as the announced port developments in the cities of Barranquilla and Cartagena have crane and barge operations. According to the requirements of the new decree, all of these ports will have to introduce changes in their loading and handling equipment before the 2010 deadline.
机译:哥伦比亚矿产和能源部将在不到一个月的时间内设定最后期限,要求从2010年7月1日起直接在出口设施中进行所有煤炭装载,并使用有盖传送带进行装载。在现有设施中,只有波多黎各玻利瓦尔(塞雷洪(Cerrejon)完全专用的港口)和圣玛尔塔(Santa Marta)的卡波桑(Carbosan)直接装载。位于毗邻的塞纳加市和圣玛尔塔市的其他港口(德拉蒙德,Carbones del Caribe,Carbosan和Glencore / Prodeco的港口位于此),以及巴兰基亚和卡塔赫纳市已宣布的港口开发项目均设有起重机和驳船操作。根据新法令的要求,所有这些港口都必须在2010年截止日期之前对其装卸设备进行更改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号