...
首页> 外文期刊>McCloskey s Coal Report >Four 800MW coal units planned at Brunsbuttel
【24h】

Four 800MW coal units planned at Brunsbuttel

机译:计划在Brunsbuttel建造四个800MW燃煤机组

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Getec Energie, a relative newcomer to Germany's energy sector, has announced plans for an 800MW coal power station at the Bayer Material Science industry-park at the North Sea port of Brunsbuttel. Commissioning is earmarked for 2013. This is the fourth 800MW coal unit under development at the port. The Belgian Electrabel plans an 800MW unit while SdwestStrom has two 800MW units under development in partnership with Spanish energy company Iberdrola. These three plants are planned to come on line in 2012. If all four units are built, steam coal use at Brunsb, ttel could reach up to 8mt/year by 2014.
机译:Getec Energie是德国能源领域的一个相对较新的成员,已宣布计划在北海布伦斯比特尔港口的拜耳材料科学工业园区建设一个800兆瓦的燃煤电站。计划于2013年进行调试。这是该港口正在开发的第四座800MW燃煤机组。比利时Electrabel计划与西班牙能源公司Iberdrola合作开发800MW机组,而SdwestStrom则有2台800MW机组正在开发中。这三个工厂计划于2012年投入生产。如果全部四个工厂都建成,那么到2014年,布伦斯伯的ttel动力煤使用量将达到每年8吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号