首页> 外文期刊>Canadian Geotechnical Journal >Stabilization of the North river bank of the La Grande 1 hydroelectrical project [French]
【24h】

Stabilization of the North river bank of the La Grande 1 hydroelectrical project [French]

机译:拉格兰德一号水电项目北河岸的稳定[法文]

获取原文
获取原文并翻译 | 示例
           

摘要

The La Grande 1 (LG-1) hydroelectrical project, part of the La Grande Complex in Northern Quebec, required the construction of a 2444 m long dyke on the north bank of the river. The presence of sensitive marine clay, covered with deltaic sand and silt deposit, and river sand deposit, called for special design features such as downstream bank and upstream bank stabilization berms to avoid the occurrence of potentially disastrous retrogressive slides. This paper describes the geotechnical and hydrogeological conditions of the northern terrace and presents the different construction phases of the riverbank stabilization, with emphasis on the control of groundwater pressures in the lower aquifer by the use of relief wells. [References: 9]
机译:作为魁北克北部拉格兰德综合体的一部分,拉格兰德1号(LG-1)水电项目要求在河北岸建造2444 m长的堤坝。敏感的海洋粘土的存在,覆盖有三角洲砂和淤泥沉积物以及河砂沉积物,因此需要特殊的设计功能,例如下游河岸和上游河岸稳定护堤,以避免发生潜在的灾难性倒退滑坡。本文描述了北部阶地的岩土和水文地质条件,并介绍了河岸稳定的不同建设阶段,重点是通过使用泄压井来控制下部含水层中的地下水压力。 [参考:9]

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号