...
首页> 外文期刊>Foundry Trade Journal >High deposition welding of Francis turbine runners
【24h】

High deposition welding of Francis turbine runners

机译:弗朗西斯涡轮转子的高熔敷焊接

获取原文
获取原文并翻译 | 示例

摘要

Castings form an integral part of the world's largest hydroelectric project. The world's largest hydroelectric project, the Three Gorges dam in China, will comprise 26 Francis turbines for the production of electricity. Each turbine runner is 10 metres in diameter, weighs 450 tonnes and will generate 700MW. The runners are made of solid 410 NiMo type martensitic stainless stele (13 percent Cr, 4 percent Ni, 0.5 percent Mo) castings. Welding is used for the assembly and repair of casting defects. ESAB is involved in the production of the runners with consumables and equipment for submerged arc welding (SAW) and gas metal arc welding (GMAW).
机译:铸件是世界上最大的水力发电项目不可或缺的一部分。世界上最大的水力发电项目,中国的三峡大坝,将包括26台用于发电的弗朗西斯水轮机。每个涡轮机转轮直径为10米,重450吨,将产生700MW。流道由410 NiMo型马氏体不锈钢实心铸铁(13%Cr,4%Ni,0.5%Mo)铸件制成。焊接用于组装和修复铸件缺陷。 ESAB参与了流道的生产,该流道包括用于埋弧焊(SAW)和气体金属电弧焊(GMAW)的易损件和设备。

著录项

  • 来源
    《Foundry Trade Journal 》 |2003年第3604期| 共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铸造 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号