首页> 外文期刊>Management of Environmental Quality >Improving effectiveness of mitigation measures in EIA follow-up - The case of a highway construction in Brazil
【24h】

Improving effectiveness of mitigation measures in EIA follow-up - The case of a highway construction in Brazil

机译:在环境影响评估中提高缓解措施的有效性-以巴西的公路建设为例

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The purpose of this paper is to investigate the effectiveness of mitigation measures adopted in a scheme of EIA follow-up by examining their performance in reducing geo-environmental impacts in earthwork activities during the Rodoanel southern section construction in Sao Paulo, Brazil. This environment is fragile in terms of affected watersheds because the highway crosses two important reservoirs that supply most of the metropolitan water demand. Therefore, this research also aims at promoting water quality control. Design/methodology/approach - This study combines complementary sources as evidences in the literature and field checks, tests and monitoring. The methodology was supported by criteria for evaluating the effectiveness of mitigation measures in the case study approach. Findings - The EIA follow-up activities contributed to the maintenance of environmental conditions in the majority of the control points at the end of the construction phase. Water quality parameters were not statistically different before and during the construction of the highway. The choice and arrangement of mitigation measures were successful in ensuring water quality control by avoiding siltation. Practical implications - A robust scheme for designing and evaluating mitigation measures contributes to the improvement of their effectiveness and is pivotal to the success of the EIA follow-up. Originality/value - This case study serves as an example for extending EIA follow-up practice in special to the improvement of the design and evaluation of mitigation measures in similar contexts.
机译:目的-本文的目的是通过调查在巴西圣保罗的Rodoanel南段建设期间,其在减少土方活动对地球环境的影响方面的表现,来研究在EIA后续计划中采用的缓解措施的有效性。就受影响的分水岭而言,这种环境是脆弱的,因为高速公路横穿了满足大部分都市水需求的两个重要水库。因此,本研究也旨在促进水质控制。设计/方法/方法-这项研究结合了补充资料,作为文献和现场检查,测试和监测的证据。该方法得到了案例研究方法中评估缓解措施有效性的标准的支持。调查结果-在施工阶段结束时,EIA的后续活动有助于维护大多数控制点的环境条件。在公路建设之前和期间,水质参数没有统计学差异。缓解措施的选择和安排成功地避免了淤积,从而确保了水质的控制。实际意义-设计和评估缓解措施的有效方案有助于提高其有效性,并且对于EIA后续行动的成功至关重要。原创性/价值-该案例研究为扩展EIA后续措施实践提供了一个示例,特别是在类似情况下改进了缓解措施的设计和评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号