首页> 外文期刊>Canadian Welding Association Journal >Power Piping Welding: A Canadian Case Study
【24h】

Power Piping Welding: A Canadian Case Study

机译:电力管道焊接:加拿大案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Until recently, the demand for new power-plant construction in Canada has been relatively low. Power imports from the United States have been able to meet peak demands, leaving new construction plans on hold. However, due to the de-commissioning of coal-fired plants in Ontario, several new combined-cycle gas-turbine power plants are now under construction. One such plant is Sithe Global's Goreway station, located minutes north of the Toronto Airport. This is the first major power plant to be built in 25 years in Ontario. This paper reports on the challenges faced in welding the high-energy power piping for the heat-recovery steam generator (HRSG) and the training of local craft workers, and provides perspective for future projects.
机译:直到最近,加拿大对新建电厂的需求仍相对较低。从美国进口的电力已经能够满足高峰需求,因此搁置了新的建设计划。但是,由于安大略省燃煤电厂的退役,一些新的联合循环燃气轮机电厂正在建设中。其中之一就是位于多伦多机场以北数分钟的Sithe Global的Goreway站。这是25年以来在安大略省建成的第一座大型发电厂。本文报告了为热回收蒸汽发生器(HRSG)焊接高能动力管道和当地手工艺工人培训所面临的挑战,并为未来的项目提供了前景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号