首页> 外文期刊>Machinery >Walters new tooling plant offers double capacity
【24h】

Walters new tooling plant offers double capacity

机译:沃尔特斯新模具厂产能翻番

获取原文
获取原文并翻译 | 示例
           

摘要

Tooling manufacturer Walter AG, Germany has opened a new ?30 million manufacturing plant for carbide insert production in Munsingen (pictured)- in the Swabian Alb region some 40 km from the parent site in Tubingen, near Stuttgart. With this investment, completed on a 40,000 m2 greenfield location in barely nine months, the company now has the capacity to double its output to literally multi-millions of inserts to meet growing global demand, in particular for its world leading range of Tiger.tec products.
机译:德国的模具制造商Walter AG在斯文比亚Alb地区的Munsingen(如图所示)开了一个新的3000万欧元的工厂,用于生产硬质合金刀片,该工厂距离斯图加特附近的Tubingen母公司约40公里。这项投资仅用了不到9个月的时间就在40,000平方米的未开发土地上完成了投资,该公司现在有能力将其产量翻倍,达到数百万个刀片,以满足不断增长的全球需求,尤其是其世界领先的Tiger.tec系列产品。产品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号