...
【24h】

New fuzzy models for time-cost trade-off problem

机译:时间成本权衡问题的新模糊模型

获取原文
获取原文并翻译 | 示例

摘要

The time-cost trade-off problem is a specific type of the project scheduling problem which studies how to modify project activities so as to achieve the tradeoff between the completion time and the project cost. In real projects, the trade-off between the project cost and the completion time, and the uncertainty of the environment are both considerable aspects for managers. In this paper, three new fuzzy time-cost trade-off models are proposed, in which credibility theory is applied to describe the uncertainty of activity duration times. A searching method by integrating fuzzy simulation and genetic algorithm is produced to search the quasi-optimal schedules under some decision-making criteria. The purpose of the paper is to reveal how to obtain the optimal balance of the completion time and the project cost in fuzzy environments.
机译:时间成本权衡问题是项目调度问题的一种特殊类型,它研究如何修改项目活动以实现完成时间与项目成本之间的权衡。在实际项目中,项目成本与完成时间之间的折衷以及环境的不确定性对于管理人员而言都是相当重要的方面。本文提出了三种新的模糊时间成本权衡模型,其中使用可信度理论描述了活动持续时间的不确定性。提出了一种将模糊仿真与遗传算法相结合的搜索方法,以在某些决策准则下搜索准最优计划。本文的目的是揭示在模糊环境中如何获得完工时间和项目成本的最佳平衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号