...
首页> 外文期刊>Foster Natural Gas Report >ALGONQUIN ADDRESSES PROTESTS OVER COST AND RATE IMPLICATIONS OF ITS HUBLINE/E2W PROJECT
【24h】

ALGONQUIN ADDRESSES PROTESTS OVER COST AND RATE IMPLICATIONS OF ITS HUBLINE/E2W PROJECT

机译:阿尔金顿地址针对其HUBLINE / E2W项目的成本和费率进行抗议

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Algonquin Gas Transmission,LLC(CP08-420),answering various pleadings that address its certificate application for its HubLine/East to West Project(HubLine/E2W Project),"fundamentally agrees"with the parties that a future Section 4 rate case should be the venue for reviewing its desire to roll in the costs of this project and its previous HubLine 2003 Project(the 2009 HubLine Combined Project).
机译:Algonquin气体传输公司(LLC)(CP08-420)回答了有关其HubLine / East to West项目(HubLine / E2W项目)的证书申请的各种诉求,“从根本上同意”双方当事人,未来的第4节费率案例应审查其希望分担该项目及其以前的HubLine 2003项目(2009 HubLine合并项目)成本的场所。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号