...
首页> 外文期刊>Foster Natural Gas Report >NEB Approves Trans Mountain Rate Methodology for Proposed Expanded Petroleum Pipeline System
【24h】

NEB Approves Trans Mountain Rate Methodology for Proposed Expanded Petroleum Pipeline System

机译:NEB批准了拟议中的扩建石油管道系统的跨山率方法论

获取原文
获取原文并翻译 | 示例
           

摘要

On 5/16/13 the National Energy Board (NEB) of Canada approved the application by Trans Mountain Pipeline ULC (a Kinder Morgan Canada project) for the rate (toll) methodology that would be implemented on the proposed Trans Mountain expanded petroleum pipeline system, if the system is eventually expanded. In all, 13 “large, sophisticated shippers” (in the NEB’s perception) executed long-term agreements and 11 of these took no issue with the toll methodology. The Board found, “on balance, that the methodology will produce rates that will be just, reasonable and not unjustly discriminatory.” This application did not seek Board approval to construct the expanded system. The NEB does not currently have a facilities expansion application before it from Trans Mountain regarding the future planned expansion of the pipeline. (Toll Order TO-004-2013).
机译:2013年5月16日,加拿大国家能源局(NEB)批准了Trans Mountain Pipeline ULC(加拿大Kinder Morgan项目)对将在拟议中的Trans Mountain扩展石油管道系统上实施的费率(通行费)方法的申请,如果系统最终得以扩展。 NEB认为,总共有13家“大型,精巧的托运人”签署了长期协议,其中11家对收费方法没有问题。审计委员会发现,“总的来说,该方法所产生的汇率将是公正,合理且不具有不公正歧视性。”该申请未获得董事会的批准以构建扩展系统。 NEB目前尚未从Trans Mountain处获得有关管道的未来计划扩展的设施扩展应用程序。 (收费单TO-004-2013)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号