...
首页> 外文期刊>Foster Natural Gas Report >ROCKIES EXPRESS PIPELINE AND ULTRA RESOURCES PROTEST FERC REQUIRING REX TO ALLOW BACKHAUL SERVICE CUSTOMERS TO USE FORWARD-HAUL SERVICE ON A SECONDARY BASIS AT A LOWER RATE THAN RATE PAID BY COMMITTED SHIPPERS
【24h】

ROCKIES EXPRESS PIPELINE AND ULTRA RESOURCES PROTEST FERC REQUIRING REX TO ALLOW BACKHAUL SERVICE CUSTOMERS TO USE FORWARD-HAUL SERVICE ON A SECONDARY BASIS AT A LOWER RATE THAN RATE PAID BY COMMITTED SHIPPERS

机译:洛矶山脉的输油管道和超资源抗议专用网要求REX允许回程服务客户在次要基础上使用远航服务,而运费要比定单托运人所支付的价格低

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Rockies Express Pipeline LLC (REX) (RP11-2096) sought rehearing of FERC's order issued June 17 that accepted and suspended, subject to conditions, proposed tariff records it filed on May 6, as amended on May 18, that is know as the BHS Proposal. The BHS Proposal sought approval of a new mainline displacement-only backhaul service under a new Rate Schedule BHS (Backhaul Transportation Service). FERC scrutinized the proposal generally and imposed a condition on REX "so that a BHS service customer may use secondary points in a manner that would allow for forward-haul [transportation]," stating that prohibiting the use of secondary receipt points in this manner "is contrary to the Commission's policy of flexible receipt and delivery points."
机译:落基山脉快运管道有限责任公司(REX)(RP11-2096)要求对FERC的命令进行排练,该命令于6月17日接受并中止了其在5月6日提交并于5月18日修改的拟议关税记录(视情况而定),即BHS提案。 BHS提案寻求根据新的费率表BHS(回程运输服务)批准一种新的仅干线位移回程服务。 FERC对该提案进行了详细审查,并对REX施加了条件,“以便BHS服务客户可以以允许进行远距离运输的方式使用次级点,”指出禁止以这种方式使用次级接收点”违反了委员会灵活的收货和交货点政策。”

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号