...
首页> 外文期刊>Foster Natural Gas Report >BRIDGER PIPELINE'S REPLY TO PROTEST PORTRAYS EXTREME CONGESTED OIL SUPPLY TRANSPORTATION SITUATION IN BAKKEN SHALE AREA AND SIGNIFICANT INFRASTRUCTURE BUILDING ACTIVITY
【24h】

BRIDGER PIPELINE'S REPLY TO PROTEST PORTRAYS EXTREME CONGESTED OIL SUPPLY TRANSPORTATION SITUATION IN BAKKEN SHALE AREA AND SIGNIFICANT INFRASTRUCTURE BUILDING ACTIVITY

机译:BRIDGER PIPELINE的答辩形容为巴肯页岩地区的最主要的供油状况和重要的基础设施建设活动

获取原文
获取原文并翻译 | 示例

摘要

Bridger Pipeline LLC (IS11-313) says its proposed new three-tier penalty system for over-nomination activity is merely a crucial tool it needs to manage its pipeline system operating in a prolific producing area that is tapping significant new oil supplies in the Bakken Shale area of North Dakota. A protest by Concord Energy LLC, filed in mid-May, challenges one tier of its proposed tariff modifications and should be rejected, answered Bridger. The rapid increase in production has challenged the existing pipeline infrastructure. As a result, maintaining and increasing regional pipeline capacity, and ensuring the efficient use of existing, capacity is a serious matter for all market stakeholders, and a focus for Bridger. Bridger said its tiered penalty approach, described in an April 29 filing, is a key element of that focus, aimed at promoting efficient utilization of its system and maximizing the use of available capacity in the Bakken Shale.
机译:布里奇管道有限责任公司(IS11-313)表示,针对过度提名活动提议的新三级罚款系统只是其管理在多产的地区运营的管道系统所需的关键工具,该地区正在利用巴肯的大量新石油供应北达科他州页岩区。布里奇回答说,康科德能源有限责任公司于5月中旬提出的抗议对其拟议的关税修改方案提出了质疑,应予以拒绝。产量的快速增长对现有的管道基础设施提出了挑战。结果,维护和增加区域管道能力,并确保有效利用现有的能力,对于所有市场利益相关者来说都是一个严重的问题,也是Bridger的关注重点。布里奇尔说,4月29日提交的文件中描述的分级罚款方法是该重点的关键要素,旨在促进对其系统的有效利用,并最大限度地利用巴肯页岩中的可用容量。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号