...
首页> 外文期刊>Foster Natural Gas Report >EQUITRANS PROPOSES SCHEDULING/ CURTAILMENT PRIORITY CHANGES; PROTESTS AND COMMENTS ELUCIDATE NEW QUEUE ARRANGEMENT AND INTERRUPTIBLE ALLOCATION BASED ON ECONOMIC VALUE RATHER THAN FIRST-COME, FIRST-SERVED PRINCIPLE
【24h】

EQUITRANS PROPOSES SCHEDULING/ CURTAILMENT PRIORITY CHANGES; PROTESTS AND COMMENTS ELUCIDATE NEW QUEUE ARRANGEMENT AND INTERRUPTIBLE ALLOCATION BASED ON ECONOMIC VALUE RATHER THAN FIRST-COME, FIRST-SERVED PRINCIPLE

机译:EQUITRANS建议更改时间表/购买优先级;抗议和评论基于比先到先得原则更经济的价值来确定新的队列安排和可中断分配

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Philadelphia Gas Works (PGW) urged FERC to reject the setting of a new sequence of scheduling for firm natural gas deliveries and storage proposed by Equitrans, LP (RP11-1867) in a March 2 filing. Alternatively, PGW asked the Commission to suspend the proposal for the maximum period and to set it for hearing. PGW said Equitrans' proposed sequence of scheduling is fatally flawed because it is internally inconsistent and will give rise to confusion in the scheduling of firm services. PGW added that it “understands that Equitrans' agrees that its proposal is internally inconsistent and will propose alternative language.” PGW is supplied in part by Equitrans. Other customers have a dispute with the future disposition of interruptible transportation in the pipeline's priority queue.
机译:费城天然气厂(PGW)敦促FERC拒绝由Equitrans,LP(RP11-1867)在3月2日提交的文件中提出的确定天然气稳固交付和存储的新计划顺序。另外,PGW要求委员会在最长期限内暂缓该提案并进行听证。 PGW说,Equitrans提出的调度顺序存在严重缺陷,因为它在内部不一致,并且会在公司服务的调度中引起混乱。 PGW补充说,“它理解Equitrans同意其提议在内部不一致,并将提议其他语言。” PGW部分由Equitrans提供。其他客户对管道优先队列中未来可中断运输的处置方式有争议。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号