...
首页> 外文期刊>Foster Natural Gas Report >FERC Suspends Postrock KPC Pipeline’sProposed Interim Solution to a “NitrogenProblem” After Scissortail Makes a Fuss
【24h】

FERC Suspends Postrock KPC Pipeline’sProposed Interim Solution to a “NitrogenProblem” After Scissortail Makes a Fuss

机译:在Scissortail大惊小怪之后,FERC暂停了Postrock KPC管道提出的“氮问题”临时解决方案

获取原文
获取原文并翻译 | 示例

摘要

On 2/29/12 FERC accepted and suspended aJanuary 30 revised tariff proposal of PostRock KPCPipeline, LLC (KPC) (RP12-346) that was intendedto establish an interim clarification of the natural gaspipeline’s authority to consider blending and pairingarrangements when deciding whether to exercisediscretion to accept receipts that fail to meetapplicable gas quality specifications. KPC requestedan effective date of March 1, but the Commission’ssuspension will last through August 1, or earlier ifthe Commission so directs, and is subject to theoutcome of a technical conference. FERC said theparties raised serious issues concerning theinterpretation and application of KPC’s proposedrevision to its tariff. A technical conference is anopportunity for the parties and the Commission’sStaff to explore the issues.
机译:12月2日至29日,FERC接受并暂停了PostRock KPCPipeline,LLC(KPC)(RP12-346)于1月30日修订的关税提案,该提案旨在临时澄清天然气管道在决定是否行使酌处权时考虑混合和配对安排的权力。接受不符合适用的气体质量规格的收据。 KPC要求将生效日期定为3月1日,但委员会的停权将持续到8月1日,如果委员会指示这样做,则暂停时间更早,具体时间取决于技术会议的结果。 FERC表示,当事方对KPC提议的关税修改及其解释和适用提出了严重的问题。对于双方和委员会的工作人员来说,召开技术会议是一个机会,以探讨这些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号