首页> 外文期刊>Foster Natural Gas Report >El Paso Insists FERC's Gulf South Order Is Model for Changes to the Right-of-First-Refusal Process That it Seeks, Despite Objection from MGI Supply
【24h】

El Paso Insists FERC's Gulf South Order Is Model for Changes to the Right-of-First-Refusal Process That it Seeks, Despite Objection from MGI Supply

机译:埃尔帕索坚持FERC的墨西哥湾南部秩序是改变其寻求的优先购买权程序的模型,尽管MGI供应商对此表示反对

获取原文
获取原文并翻译 | 示例
           

摘要

On 6/5/09 El Paso Natural Gas Co. (EPNG) (RP09-601), answering a protest filed by MGI Supply Ltd. (MGI) on June 1, attempted to further clarify the right-of-first-refusal (ROFR) process on its system and to support changes. Among the changes, EPNG specified a 10-day period to allow it and the existing shipper to negotiate a new contract if no acceptable bids were received during an open season. Additionally, if no acceptable bids were received, the existing shipper may unilaterally elect to retain the capacity in a new contract by agreeing to pay the applicable maximum rate for a term of one year or more. If, after the ten days, EPNG and the existing shipper do not agree or the existing shipper is unwilling to retain the capacity, the capacity would become generally available under the pipeline's tariff for all shippers including the existing shipper.
机译:在2009年6月5日,埃尔帕索天然气公司(EPNG)(RP09-601)回应了MGI Supply Ltd.(MGI)提出的抗议,试图进一步澄清优先购买权( ROFR)过程并支持更改。在更改中,EPNG指定了10天的期限,以便在开放季节未收到可接受的投标时允许它和现有的托运人就新合同进行谈判。此外,如果没有收到可接受的投标,则现有的托运人可以单方面选择通过同意支付一年或一年以上的适用最高费率来保留新合同中的容量。如果在十天后,EPNG和现有托运人不同意,或者现有托运人不愿意保留该容量,则根据管道费率,包括现有托运人在内的所有托运人通常都可以使用该容量。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号