首页> 外文期刊>Foster Natural Gas Report >FERC Reconsiders Transco's Services at Station 85, Based on One Pool in Two Zones, and Advises Establishment of Two Pools Structure
【24h】

FERC Reconsiders Transco's Services at Station 85, Based on One Pool in Two Zones, and Advises Establishment of Two Pools Structure

机译:FERC基于两个区域中的一个池重新考虑了Transco在85号站的服务,并建议建立两个池结构

获取原文
获取原文并翻译 | 示例
           

摘要

On 7/15/10 FERC determined on rehearing that Transcontinental Gas Pipe Line Corp. (RP01-245) should adopt a modified pooling/zone structure to accommodate changes in the use of Transco's system and pooling at Station 85 since the record in this proceeding was established. On 3/22/10, Transco and Florida Power Corp. d/b/a Progress Energy Florida, Inc. (PEF) had filed requests for clarification or, in the alternative, rehearing of the February 18 order that had accepted a filing by Transco to establish a just and reasonable rate under section 5 of the Natural Gas Act (NGA) with respect to pooling at Station 85. Reconsidering on the basis of those pleadings, the Commission granted rehearing concerning the just and reasonable pooling structure to be implemented on Transco, found that a 2 pool/zone structure will provide just and reasonable rates for pooling on Transco, and made this NGA section 5 action effective on the first of the month 60 days from the date of the order. A technical conference is unnecessary at this point. However, the Commission recognized that other methods for accomplishing pooling at Station 85 may exist, and Transco is free to consult with its shippers and file an alternative proposal pursuant to NGA section 4 if it believes a different approach is warranted.
机译:FERC于7/15/10进行预审后决定,跨洲天然气管道公司(RP01-245)应采用修改后的合并/区域结构,以适应Transco系统的使用以及在第85站的合并,因为此过程中的记录建立了。 2010年3月22日,Transco和Florida Power Corp. d / b / a Progress Energy Florida,Inc.(PEF)提出了澄清要求,或者要求对2月18日已接受Transco根据《天然气法》(NGA)第5节就第85站的集中度确定了合理合理的费率。基于这些诉求,委员会重新考虑了将在2007年实施的公正合理的合并结构。 Transco发现2池/区域结构将为在Transco上的池提供合理且合理的费率,并使该NGA第5节行动在订单日期起60个月的月初生效。此时,无需召开技术会议。但是,委员会认识到可能存在用于在第85站完成集中化的其他方法,如果Transco认为有必要采用其他方法,则可以自由与货运公司协商,并根据NGA第4节提出替代建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号