...
首页> 外文期刊>Foster Natural Gas Report >Columbia Gas Report on Use of Millennium Capacity Sets off Storm of Accusations from Certain Customers Who Allege Misrepresentation of Facts in Tracker Cases
【24h】

Columbia Gas Report on Use of Millennium Capacity Sets off Storm of Accusations from Certain Customers Who Allege Misrepresentation of Facts in Tracker Cases

机译:哥伦比亚天然气公司关于使用千禧年产能的报告引发了某些客户的指控风暴,这些客户声称在追踪器案例中陈述了错误的事实

获取原文
获取原文并翻译 | 示例

摘要

Columbia Gas Transmission LLC's (RP10-401) May 3 "Report on Operational Need for Millennium FT-1 Capacity"1 concerning the disposition of Rate Schedule FT-1 firm capacity that it holds on Millennium Pipeline Co. LLC, another NiSource Gas Transmission & Storage company, triggered a strongly worded objection from Baltimore Gas and Electric Co. (BGE) and a joint protest from the Easton Utilities Commission, the City of Charlottesville, Virginia, and the City of Richmond, Virginia (collectively, Cities). According to the Cities, Columbia's filing is devoid of any support for the conclusion it no longer needs any of the 24,600 dth/d of the Millennium FT-1 capacity that the Commission authorized it to recover through the operations tracker (or TCRA). These protesters also linked the disclosures to prescient warnings of parties to the proceeding in Docket RP10-577 related to Columbia's offsystem capacity tracker.
机译:哥伦比亚天然气输送有限责任公司(RP10-401)5月3日“关于千年FT-1容量的运营需求的报告” 1涉及其对Millennium Pipeline Co. LLC(另一家NiSource天然气传输和仓储公司引发了巴尔的摩天然气和电力公司(BGE)的强烈反对,并引起了Easton公用事业委员会,弗吉尼亚州夏洛茨维尔市和弗吉尼亚州里士满市(统称为城市)的联合抗议。据各城市称,哥伦比亚的申请没有得出结论的任何支持,因为该结论不再需要委员会授权其通过运营跟踪器(或TCRA)恢复的FT-1年产能的24,600 dth。这些抗议者还将披露内容与各方对与哥伦比亚的离网容量跟踪器有关的Docket RP10-577程序的预先警告有关。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号