首页> 外文期刊>Foster Natural Gas Report >Southern Trails Pipeline Must Revise Non-Conforming Contract Provision That Confers Unilateral Contract Termination Right
【24h】

Southern Trails Pipeline Must Revise Non-Conforming Contract Provision That Confers Unilateral Contract Termination Right

机译:Southern Trails管道必须修改授予单方面合同终止权的不合格合同条款

获取原文
获取原文并翻译 | 示例
           

摘要

FERC granted, in part, a request for rehearing by Questar Southern Trails Pipeline Co. (RP10-388) of a March 24 order that found an impermissible material deviation in firm transportation (FT) service agreement No. 4027 with Sempra Energy Trading Inc. (Sempra contract). The contract is for 40,000 dth/d with a primary term of 7/1/08 to 10/31/12, and the issue is whether an "evergreen" right that only a shipper can terminate is a valuable option not found in the FT pro forma service agreement.
机译:FERC批准了Questar Southern Trails Pipeline Co.(RP10-388)在3月24日发布的一项命令,要求其进行重审,该命令在与Sempra Energy Trading Inc.的第4027号牢固运输(FT)服务协议中发现了不允许的实质性偏差。 (Sempra合同)。合同为40,000 d / d /天,主要期限为7/1/08至10/31/12,问题在于,《金融时报》没有找到仅托运人可以终止的“常绿”权利吗?备考服务协议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号