首页> 外文期刊>Foster Natural Gas Report >INERGY MOVES AHEAD ON ITS MARC I HUB LINE PROJECT OVER THE MARCELLUS SHALE PRODUCING REGION OF PENNSYLVANIA
【24h】

INERGY MOVES AHEAD ON ITS MARC I HUB LINE PROJECT OVER THE MARCELLUS SHALE PRODUCING REGION OF PENNSYLVANIA

机译:宾夕法尼亚州马可斯页岩产区的能源在其马克西-哈勃线项目中向前发展

获取原文
获取原文并翻译 | 示例
           

摘要

Inergy,LP announced on August 6 that its wholly-owned subsidiary Inergy Midstream,LLC received indications of interest exceeding 200% of the desired capacity to construct the previously announced 43-mile Marc I Hub Line,a 24-inch diameter bi-directional natural gas pipeline extending between Inergy's Stagecoach South Lateral pipeline interconnect at Tennessee Gas Pipeline Co.'s 300 Line and Transcontinental Gas Pipeline Corp.'s Leidy Line,both located in Bradford County,Pa."The response to our proposed Marc I pipeline development was outstanding.Not only did we receive expected volume interest from local distribution companies seeking to enhance their supply portfolio and increase reliability,but we also confirmed strong interest from local producers with development rights in the high profile Marcellus shale that exists the length of the pipeline,"said John Sherman,President and CEO of Inergy.
机译:Inergy,LP在8月6日宣布,其全资子公司Inergy Midstream,LLC收到的利益迹象超过了建造先前宣布的43英里Marc I Hub Line(24英寸直径双向自然管道)所需能力的200%位于田纳西州天然气管道公司300号管线的Inergy驿马车南侧管道互连和宾夕法尼亚州布拉德福德县的横贯大陆天然气管道公司的雷迪管线之间延伸的天然气管道。“对我们提议的Marc I管道开发的反应是我们不仅从当地分销公司那里获得了预期的批量需求,这些公司希望增加供应量并提高可靠性,而且还确认了本地生产商的浓厚兴趣,这些生产商对拥有高开发长度的Marcellus页岩拥有开发权, “ Inergy总裁兼首席执行官John Sherman说。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号