首页> 外文期刊>Foster Natural Gas Report >Kern River's Collateral Requirements Remain Ambiguous, According to Comments
【24h】

Kern River's Collateral Requirements Remain Ambiguous, According to Comments

机译:评论说,克恩河的抵押品要求仍然不明确

获取原文
获取原文并翻译 | 示例
           

摘要

RRI Energy Services, Inc. (RES) on 6/10/09 faulted an answer filed by Kern River Gas Transmission Co. (RP09-466) in response to a show cause request composed in an order issued 5/1/09 by FERC regarding the creditworthiness provisions of the Kern River tariff. Kern River had been directed to show cause, pursuant to Section 5 of the Natural Gas Act, that current lending agreements justify the need for a collateral requirement in excess of three months of reservation charges. On May 29, Kern River responded.
机译:RRI能源服务有限公司(RES)于2009年6月10日对Kern River Gas Transmission Co.(RP09-466)提出的答复提出质疑,以回应FERC于5/1/09发出的命令中规定的表演原因请求关于克恩河关税的信誉条款。根据《天然气法》第5条,指示科恩·里弗(Kern River)出示原因,表明当前的借贷协议证明需要超过三个月的保留费用的抵押要求。 5月29日,克恩河作出回应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号