...
首页> 外文期刊>Foster Natural Gas Report >Uncontested Settlement Offer Certified to FERC Resolves Rates and Rolled-In Project Costs for WBI Energy Transmission
【24h】

Uncontested Settlement Offer Certified to FERC Resolves Rates and Rolled-In Project Costs for WBI Energy Transmission

机译:经FERC认证的无争议结算提议解决了WBI能源传输的费率和项目成本

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

On 6/11/14 Presiding Judge Michael Cianci, Jr. certified to FERC an offer of settlement dealing with the section 4 rate case filed 10/31/13 by WBI Energy Transmission, Inc. (RP14-118). WBI proposed to implement a general rate increase, roll into its system-wide rates the costs of 3 projects on its contiguous system (the Grasslands Pipeline Projects, the Sheyenne Expansion Project, and the Mapleton Extension), create separately-stated base rates and fixed fuel rates for two non-contiguous lateral projects (Garden Creek and Stateline), and to make certain non-substantive housekeeping changes to its tariff. The Settlement Rates are designed using a “black box” total cost of service of $95 million. It explains that the Settlement depreciation rates are the only component of the cost of service identified in the rates.
机译:14年6月11日,首席审裁官迈克尔·詹奇(Michael Cianci,Jr.)向FERC证明了WBI Energy Transmission,Inc.(13/14)提交的处理第4节费率案的和解要约。 WBI建议实施总体费率提高,将其连续系统上的3个项目(草地管道项目,Sheyenne扩建项目和Mapleton扩建项目)的成本计入全系统费率,创建单独陈述的基本费率并固定两个不连续的横向项目(花园溪和州际公路)的燃油费率,并对费率做出某些非实质性的内务调整。结算费率是使用“黑匣子”服务总成本9500万美元来设计的。它解释说,和解折旧率是费率中确定的服务成本的唯一组成部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号