...
首页> 外文期刊>Foster Natural Gas Report >Collbran Valley Abandons Plan to Transport Jurisdictional Gas via Residue Line as Gas Will Go to Enterprise's Meeker Plant
【24h】

Collbran Valley Abandons Plan to Transport Jurisdictional Gas via Residue Line as Gas Will Go to Enterprise's Meeker Plant

机译:Collbran Valley放弃了通过残留管线运输管辖性天然气的计划,因为天然气将进入企业的Meeker工厂

获取原文
获取原文并翻译 | 示例
           

摘要

Collbran Valley Gas Gathering, LLC (CVGG) (CP09-01) recently moved FERC to vacate the certificate issued to it on 8/25/09. The Commission had granted CVGG authorization to transport gas through the Anderson Gulch Residue Line. The application of CVGG, filed on 10/1/08, was for a limited-jurisdiction certificate authorizing CVGG to transport natural gas from the tailgate of CVGG's Anderson Gulch Plant through 9 miles of 16-inch diameter pipeline (Anderson Gulch Residue Line) to interconnects with Rocky Mountain Natural Gas LLC, a Colorado local distribution company, and TransColorado Gas Transmission Co. LLC solely on behalf of CVGG's owners. CVGG also had asked for a general waiver of the Commission's rate schedule and tariff filing requirements contained in part 154 of the regulations. FERC denied the request for waiver of the blanket open access and tariff conditions.
机译:Collbran Valley Gas Gathering,LLC(CVGG)(CP09-01)最近将FERC移出了09年8月25日发给它的证书。该委员会已批准CVGG通过安德森峡谷残渣线运输天然气。 CVGG的申请于10/1/08申请,是一份有限管辖权证书,授权CVGG可以将天然气从CVGG的安德森峡谷工厂的后挡板通过9英里长的16英寸直径管道(安德森峡谷残渣线)输送到仅代表CVGG的所有者与科罗拉多州的一家本地分销公司Rocky Mountain Natural Gas LLC和TransColorado Gas Transmission Co. LLC互连。 CVGG还要求普遍豁免该法规第154部分所载的委员会的费率表和关税备案要求。 FERC拒绝了放弃全面开放访问和资费条件的请求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号