首页> 外文期刊>Foster Natural Gas Report >Cheyenne Plains Is Approved to Adopt Economic True-Up, But FERC Strikes Provision That Would Permit the Gas Pipeline to Over-Collect Quantities Out of Cycle at its Own Discretion
【24h】

Cheyenne Plains Is Approved to Adopt Economic True-Up, But FERC Strikes Provision That Would Permit the Gas Pipeline to Over-Collect Quantities Out of Cycle at its Own Discretion

机译:夏安平原(Cheyenne Plains)被批准采用经济调整方案,但FERC罢工规定将允许天然气管道自行自行决定以超循环方式收集数量

获取原文
获取原文并翻译 | 示例
           

摘要

On May 30 FERC accepted a proposal of Cheyenne Plains Gas Pipeline Co., LLC (CPG) (RP08-362) to alter its fuel tracking mechanism, effective 6/1/08, subject to removal of one key proposal. CPG's current tariff provides for the reimbursement of fuel gas quantities and lost and unaccounted-for gas quantities (L&U) - collectively referred to as FL&U - through an in-kind volumetric true-up mechanism.
机译:FERC于5月30日接受了夏安平原燃气管道有限公司(CPG)(RP08-362)的一项提案,该提案旨在更改其燃料跟踪机制,于6/1/08生效,但要删除一项关键提案。 CPG当前的收费标准是通过实物体积调整机制来补偿燃料气体量以及丢失和未确认的气体量(L&U)(统称为FL&U)。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号