...
首页> 外文期刊>Forest Ecology and Management >Effects of forest-management activities on runoff components and ground-water recharge to Quabbin Reservoir, central Massachusetts
【24h】

Effects of forest-management activities on runoff components and ground-water recharge to Quabbin Reservoir, central Massachusetts

机译:森林管理活动对马萨诸塞州中部奎宾水库的径流成分和地下水补给的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The effects of forest-management activities (timber cutting and herbicide application) on runoff components (total streamflow, direct runoff, and base flow) and on ground-water recharge per unit area were evaluated for two separate paired drainage basins of Quabbin Reservoir in central Massachusetts. The Cadwell Creek study area, studied from 1962-1973, included an experimental basin (Upper Cadwell Creek) and a control basin (Lower Cadwell Creek). In the experimental basin, herbicide was applied to mixed oaks, northern hardwoods, and understory vegetation in different riparian zones during the summers of 1967 and 1968, and some pine plantations were thinned or clear-cut during the winter of 1967-1968. These forest-management activities decreased the total basal area by about 34%. The decrease in total basal area resulted in an increase in total streamflow, direct runoff (total streamflow minus base flow), and ground-water recharge for six dormant seasons (October-April) and six growing seasons (May-September) during 1968-1973. Base flow increased for three dormant seasons and two growing seasons during 1968-1970 and the dormant seasons of 1971 and 1973. Base flow accounted for 34% and direct runoff accounted for 66% of the 94 mm (15%) increase in total streamflow during water years 1968-1973. Sixty-one percent of this increase in total streamflow occurred in the dormant seasons.
机译:在中部的奎宾水库两个独立的成对排水盆地中,评估了森林管理活动(采伐木材和施用除草剂)对径流成分(总流量,直接径流量和基流量)以及单位面积地下水补给的影响。马萨诸塞州。 1962年至1973年研究的Cadwell Creek研究区包括一个实验盆地(上部Cadwell Creek)和一个控制盆地(下部Cadwell Creek)。在该实验盆地中,除草剂在1967年和1968年夏季应用于不同河岸带的混合栎木,北部硬木和林下植被,并且在1967-1968年冬季使一些松树林变稀或砍伐。这些森林管理活动使总基础面积减少了约34%。总基础面积的减少导致1968-2018年的六个休眠季节(十月至四月)和六个生长季节(五月至九月)的总流量,直接径流量(总流量减去基本流量)和地下水补给量的增加。 1973年。在1968-1970年和1971年和1973年的三个休眠季节期间,基流增加了三个休眠季节和两个生长季节。在此期间,基流占总流量增加94 mm(15%)的34%,直接径流占66%。 1968-1973年是水年。总流量增加的百分之六十一发生在休眠季节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号