...
首页> 外文期刊>Forest Notes >Critical Piece in Great Bay Conservation Puzzle Put into Place
【24h】

Critical Piece in Great Bay Conservation Puzzle Put into Place

机译:大湾保护难题的关键部分已到位

获取原文
获取原文并翻译 | 示例
           

摘要

On Friday afternoon, January 14th, you might have heard a loud "clink" coming from southeast New Hampshire—the sort of clink you hear when a stone mason drops the keystone into an arch. That "clink" was another piece of the Great Bay/Little Bay shoreline sliding into protected status. The Nature Conservancy, acting for the Great Bay Resource Protection Partnership, acquired a conservation easement on 33 acres in Dover at the mouth of the Bellamy River, where it enters Little Bay. The easement was immediately assigned to the Forest Society. "We're proud to partner with the Great Bay Resource Protection Partnership to conserve this critical section of the Great Bay shoreline," said Forest Society President/ Forester Jane Difley. "This area of the state has been widely recognized as an estuarine ecosystem of local, regional, and national importance."
机译:1月14日(星期五)下午,您可能会听到新罕布什尔州东南部发出的响亮“叮当声”,这是一种石匠将梯形石砸成拱形时听到的叮当声。这种“叮当声”是大湾区/小湾区海岸线进入保护状态的另一部分。代表大湾资源保护伙伴关系的自然保护组织在贝拉米河河口的多佛33英亩的土地上获得了保护地役权,并进入小海湾。地役权立即分配给森林协会。森林协会主席/森林人简·迪夫利说:“我们很高兴与大湾资源保护伙伴关系合作,以保护大湾岸线的这一关键部分。” “该州的这一地区已被广泛认为是具有地方,区域和国家重要性的河口生态系统。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号