...
首页> 外文期刊>Aluminium >Trimet commissions new horizontal continuous casting unit
【24h】

Trimet commissions new horizontal continuous casting unit

机译:

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In October 2015 Trimet Aluminium SE began operating a new horizontal continuous casting (HCC) unit, whose run-up phase was completed at the turn of the year. Since the beginning of 2016 the plant has been working in regular operation under full load, i.e. with a monthly production rate of around 5,000 tonnes of primary aluminium casting. Together with two new melting furnaces and the necessary infrastructure measures Trimet has invested some ten million euros in the plant as a whole. This extension by a second HCC unit responds to the growing demand for smelter casting alloys.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号