首页> 外文期刊>Cadalyst: Integrating Technology for Manufacturing, AEC and GIS >Golden Rule of BIM: Building owners increasingly demand improved processes and better technology to reduce costs
【24h】

Golden Rule of BIM: Building owners increasingly demand improved processes and better technology to reduce costs

机译:BIM的黄金法则:建筑业主日益要求改进流程和更好的技术以降低成本

获取原文
获取原文并翻译 | 示例
           

摘要

Nearly 10 years ago, Paul Bell, then-vice-president at Dell (and now president, Americas), observed that in the manufacturing business, "inventory ... is the physical embodiment of bad information." In AEC business, the cost of bad information is embodied in routine practices such as add/deduct alternates; allowances; requests for information (RFIs), addenda, and sketches; change orders and substitutions; material stored on site; contingencies; retainage; and - all too often - litigation. Just as end users and consumers in manufacturing and distribution supply chains ultimately pay all costs of inventory-related bad information, building and project owners - as end users and consumers of design and construction services - ultimately bear all costs of bad information in construction supply chains.
机译:大约10年前,时任戴尔副总裁(现任美洲区总裁)的保罗·贝尔(Paul Bell)指出,在制造业中,“库存...是不良信息的物理体现”。在AEC业务中,不良信息的成本体现在常规实践中,例如添加/扣除替代品;津贴;索取信息(RFI),附录和草图;变更订单和替代品;现场储存的材料;突发事件;保留;以及(常常是)诉讼。正如制造和分销供应链中的最终用户和消费者最终支付与库存相关的不良信息的所有成本一样,建筑和项目所有者–设计和建筑服务的最终用户和消费者–最终承担了建筑供应链中不良信息的所有成本。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号