首页> 外文期刊>Canadian Journal of Civil Engineering >Conflicts resolution based construction temporary facilities layout planning in large-scale construction projects
【24h】

Conflicts resolution based construction temporary facilities layout planning in large-scale construction projects

机译:大型工程项目中基于解决冲突的施工临时设施布局规划

获取原文
获取原文并翻译 | 示例
           

摘要

The construction temporary facilities layout planning (CTFLP) is important and complex in large-scale construction projects. During the CTFLP process, the general contractor has conflicts with many subcontractors regarding other pre-planning tasks, such as the transport routes planning (TRP). The resolution of the conflicts is crucial and this study attempts to determine the CTFLP considering conflicts resolution. Specifically, a novel methodology based on conflicts resolution between the CTFLP and the TRP is proposed, which can be adapted for future CTFLP based on resolving other types of conflicts. The two procedures-based methodology is composed of a bi-level model and a solution approach. The methodology is applied to a dam construction project in China to test the applicability, and the results show that it is able to obtain a satisfactory CTFLP and prevents some crucial conflicts, thus, promoting construction operations and making a significant contribution to the practice of construction projects.
机译:在大型建设项目中,施工临时设施布局规划(CTFLP)既重要又复杂。在CTFLP流程中,总承包商与许多分包商在其他预计划任务(例如运输路线计划(TRP))方面存在冲突。解决冲突至关重要,本研究尝试考虑解决冲突来确定CTFLP。具体而言,提出了一种基于CTFLP和TRP之间的冲突解决方案的新颖方法,该方法可基于解决其他类型的冲突而适用于将来的CTFLP。这两个基于过程的方法论由一个双层模型和一个解决方案方法组成。该方法在中国某大坝建设项目中的适用性进行了测试,结果表明,该方法能够获得令人满意的CTFLP,并避免了一些关键性的冲突,从而促进了施工作业,并为施工实践做出了重要贡献。项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号