首页> 外文期刊>Global Iron Ore Cost Service >APPENDIX A: COST ESTIMATING METHOD
【24h】

APPENDIX A: COST ESTIMATING METHOD

机译:附录A:成本估算方法

获取原文
获取原文并翻译 | 示例
       

摘要

The key aspects of the iron ore production process are: 12.1. Open Pit Mining - Drilling, Blasting, Excavation and Mine Haulage Almost all iron ore in the western countries is mined by open-pit methods. Overburden is stripped by bulldozers, scrapers and shovels and stored for future use in rehabilitating mining areas. Blasting is normally required and mining proceeds along successive benches as pits become progressively deeper. The blasted iron ore and waste rock are handled by front-end loaders or large diesel-electric rope or hydraulic shovels. Mine haulage is by large diesel-mechanical or diesel-electric trucks and/or conveyors to a crushing plant. Some operations load iron ore directly to railcars for movement to the crusher.
机译:铁矿石生产过程的关键方面是:12.1。露天开采-钻探,爆破,挖掘和矿山运输西方国家几乎所有铁矿石都是通过露天开采的。覆盖层被推土机,铲运机和铲子剥离,并存储起来以备将来在采矿区修复之用。通常需要进行爆破,并且随着矿坑逐渐变深,采矿将沿着连续的台阶进行。爆破的铁矿石和废石由前端装载机或大型柴油电力绳索或液压铲处理。矿山运输是通过大型柴油机械或柴油电动卡车和/或输送机输送至破碎厂的。一些操作将铁矿石直接装载到轨道车上,以运至破碎机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号