首页> 外文期刊>Canadian environmental protection >Level-Velocity Loggers deployed to Ontario township to diagnose excess flow problem
【24h】

Level-Velocity Loggers deployed to Ontario township to diagnose excess flow problem

机译:速度记录仪部署到安大略省城镇,以诊断流量过大问题

获取原文
获取原文并翻译 | 示例
           

摘要

The Glen Walter Sewage Collection System was built in 1989 to service 1,080 customers. At the time the population was 850 but by 1995 the sewage treatment plant had already reached capacity. Shawn Killoran took over as operations manager in 1999 and he, along with the mayor and council, immediately had concerns about the excess flow.
机译:Glen Walter污水收集系统建于1989年,为1,080位客户提供服务。当时的人口为850,但到1995年,污水处理厂已经达到生产能力。肖恩·基洛兰(Shawn Killoran)于1999年接任运营经理,他与市长和议会一起,对资金过剩立即感到担忧。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号