...
首页> 外文期刊>Food and Bioproducts Processing. Transactions of the Institution of Chemical Engineers, Part C >Optimization of scheduling of cleaning in heat exchanger networks subject to fouling: sugar industry case study.
【24h】

Optimization of scheduling of cleaning in heat exchanger networks subject to fouling: sugar industry case study.

机译:易结垢的热交换器网络清洁计划的优化:制糖业案例研究。

获取原文
获取原文并翻译 | 示例
           

摘要

Fouling of heat exchangers in the food industry results in frequent cleaning and an operational problem in scheduling production and cleaning periods. The complexity of the problem increases when a network involving more than one exchanger is involved, and requires a solution using integer programming techniques. A new modelling formulation has been developed to solve the resulting MINLP problem and provides near-optimal results. Application of the technique is illustrated with a case study of the raw juice preheat train in a sugar refinery featuring a network of 11 exchangers. Data reconciliation of plant information was used to generate linear fouling models for the simulation and the results are compared with current operating practice.
机译:食品工业中热交换器的结垢导致频繁清洁,并在安排生产和清洁期间安排了操作问题。当涉及一个涉及多个交换器的网络时,问题的复杂性增加,并且需要使用整数编程技术的解决方案。已经开发出新的建模公式来解决由此产生的MINLP问题,并提供接近最佳的结果。通过以糖厂为特色的原汁液预热系统案例研究,说明了该技术的应用,该糖厂具有11个交换器网络。使用工厂信息的数据协调生成模拟的线性结垢模型,并将结果与​​当前的操作实践进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号