...
首页> 外文期刊>Floor Covering Weekly >Directing your spec: Architect vs. contractor
【24h】

Directing your spec: Architect vs. contractor

机译:指导规范:建筑师与承包商

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

If the explosive growth of laminate flooring at the residential level just isn't enough, you might want to reconsider whose door you're knocking on. Many contractors are looking to commercial opportunities when it comes to specifying laminate flooring. "Architects and designers simply don't know how product is going to react after being walked on for two or three years," said Bill Becker, president of Becker Brothers, New Brighton, Minn., and member of the Floor Covering Installation Contractors Association (FCICA). "We know how it comes off a floor because we've taken it off the floor. We know what kind of furniture and traffic can go over it."
机译:如果在住宅级别的强化地板爆炸性增长还不够,那么您可能要重新考虑要敲开谁的门。在指定强化木地板时,许多承包商都在寻找商机。明尼苏达州新布莱顿市贝克尔兄弟会长,地板覆盖物安装承包商协会成员比尔·贝克尔说:“建筑师和设计师根本不知道产品在使用两三年后会如何反应。” (FCICA)。 “我们知道它是如何从地板上掉下来的,因为我们已经将它从地板上卸下了。我们知道什么样的家具和交通可以通过它。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号