Load Enhancement of Turbo Generator at SPIC, Tuticorin

机译:杜提戈林SPIC涡轮发电机的负载增强

获取原文
获取原文并翻译 | 示例
           

摘要

Southern Petrochemical Industries Corporation (SPIC) Limited's fertilizer complex at Tuticorin comprises of an ammonia plant, urea plant, sulphuric acid plant, phosphoric acid plant, two trains or di-ammonium phosphate plants and aluminium fluoride plant. SPIC had installed a Captive Power Plant (CPP) of 18.4 MW capacity to supply uninterrupted power to these plants. CPP consists of a steam generating unit of 120 TPH at 106 kscG and 482 deg C with two turbo generators of 5.4 and 13 MW capacities. Ms. KKK, Japan supplied both the turbine units that were erected and commissioned during 1986. Turbo generator-1 is of back pressure type turbine with inlet steam pressure 106 kscG and the outlet steam pressure of 45 kscG. The output of 5.2 NW was achieved during commissioning in 1986 and the unit has been running ever since. Over a period of time, the output of the unit came down slowly. The output of the unit could not be increased beyond 4.6 MW even after repeated overhauling and inspection of the entire unit. The problem was analysed systematically and rectification was carried out to achieve the rated output of 5.2 MW.
机译:南部石化工业公司(SPIC)Limited在图蒂戈林的化肥厂包括氨厂,尿素厂,硫酸厂,磷酸厂,两列火车或磷酸二铵厂和氟化铝厂。 SPIC已安装容量为18.4 MW的自备电厂(CPP),以为这些电厂提供不间断电源。 CPP包括一个120 TPH,106 kscG和482摄氏度的蒸汽发生装置,以及两个容量分别为5.4和13 MW的涡轮发电机。日本KKK女士提供了1986年架设和调试的两个涡轮机组。涡轮发电机1是背压式涡轮,入口蒸汽压力为106 kscG,出口蒸汽压力为45 kscG。在1986年的调试期间实现了5.2 NW的输出,此装置自此一直运行。在一段时间内,设备的输出缓慢下降。即使重复检修和检查整个装置,该装置的输出也不能增加到4.6 MW以上。对问题进行了系统分析,并进行了纠正,以达到5.2兆瓦的额定输出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号