...
首页> 外文期刊>Gluckauf >Rockbolting in Gateroads of Top Coal Caving Longwall faces
【24h】

Rockbolting in Gateroads of Top Coal Caving Longwall faces

机译:放顶煤长壁工作面的闸道锚固技术。

获取原文
获取原文并翻译 | 示例
           

摘要

The article presents technology development of rockbolting in gateroads of top coal caving longwall faces in Yanzhou. The development work has been concentrated on understanding behaviour of gateroads of top coal caving longwalls; introducing a monitoring based feedback design approach; upgrading rockbolting consumables and equipment; optimisation of rockbolting practice; development of effective supplemental reinforcement technique; and last but not the least, establishment of necessary legal framework such as consumable Standards and practice guidelines. The paper then highlights aspects of future development work with rockbolting in gateroads of top coal caving longwall faces, such as integrated cutting/bolting cycle for higher drivage rate.
机译:本文介绍了Yan州顶煤放长壁工作面闸门巷道锚固技术的发展。开发工作一直集中在了解放顶长壁煤巷道的行为。引入基于监控的反馈设计方法;升级锚固耗材和设备;优化锚固作业;开发有效的辅助加固技术;最后但并非最不重要的一点是,建立必要的法律框架,例如消耗品标准和实践准则。然后,本文重点介绍了在放顶煤的长壁工作面的闸门中进行锚固技术的未来开发工作的各个方面,例如集成的切割/锚固循环以提高掘进速度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号