首页> 外文期刊>Fertilizer Week >Restructuring within the industry
【24h】

Restructuring within the industry

机译:行业内的重组

获取原文
获取原文并翻译 | 示例
           

摘要

The Murrin Murrin nickel and cobalt operation, located near Leonora in Western Australia's historic northern goldfields region, since May 2008, has been restructuring its operations focusing on reducing costs. As part of its cost-cutting exercise, Minara has put on ice a planned A$300m (US$ 197.1m) heap-leach expansion project at the site (FW Online, 9 January 2008). The operation has capacity to produce 40,000t/y of nickel metal and 2,500t/y cobalt metal, and includes a 4,500t/d sulphuric acid plant to supply acid for high-pressure, acid leach treatment of the laterite ores. It also includes a 2,000t/y heap leach demonstration plant.
机译:自2008年5月以来,Murrin Murrin镍钴矿业务位于西澳大利亚州历史悠久的北部金矿地区的Leonora附近,该公司一直在进行业务结构调整,着眼于降低成本。作为削减成本活动的一部分,米纳拉(Minara)计划在该站点进行3亿澳元(1.971亿美元)的堆浸扩展项目(FW Online,2008年1月9日)。该工厂的产能为年产40,000吨镍金属和2500吨/年钴金属,并包括一个4,500吨/天的硫酸工厂,用于为红土矿石的高压酸浸处理提供酸。它还包括一个2,000吨/年的堆浸示范工厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号