首页> 外文期刊>Fertilizer Week >OCP to load three 80,000 mt vesssels by mid March
【24h】

OCP to load three 80,000 mt vesssels by mid March

机译:OCP将于三月中旬装载三艘80,000吨船

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Three vessels with over 80,000 mt capacity will arrive into Jorf Lasfar for loading between February 21 and March 5 plus a fourth with 76,000 mt - as follows: Pontovremon - 76,318 mt arriving Feb 21. Three Saskias - 81,094 mt arriving Feb 22. Bahri Trader - 81,855 mt arriving Feb 26. Puppis Ocean - 81,070 arriving March 5. At least two of these vessels will load a combination of DAP/MAP and NPS for traders in the US, Helm and Koch, as reported last week in Fertilizer?Week.
机译:三艘载货量超过80,000公吨的船只将在2月21日至3月5日之间抵达约尔夫·拉斯法尔(Jorf Lasfar)进行装载,再加上第四艘载货量为76,000公吨的货物-如下:Pontovremon-76,318公吨,2月21日到达。三艘Saskias-81,094公吨的2月22日到达。Bahri Trader- 81,855吨到达2月26日。Puppis Ocean-81,070到达3月5日。如上周在Fertilizer?Week上报道的那样,其中至少有两艘将为美国,Helm和Koch的商人装载DAP / MAP和NPS的组合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号