Current building practices adopt a well-established, multi-layer system, in which the external structures, internal finish, insulation, fixtures and fittings are added sequentially. Whether conducted in a factory or directly onsite, this process allows a number of standardised planar or columnar components to be combined to build structures of varying shape, size and complexity in a step-wise manner. However, it is also a time-consuming and inflexible process that can be wasteful in terms of the materials used,
展开▼