Glassolutions has been shortlisted in the G15 Commercial Project of the Year category for its work at Tower Bridge. Glassolutions designed and installed two glass floor walkways at the historic London landmark. The specification of the glass included a consideration of its durability and strength, privacy from viewers on the ground, wind loading, and the potential impact should a passing vessel strike the walkways as well as access issues.
展开▼