首页> 外文期刊>Greenhouse Canada >'Show me the money'
【24h】

'Show me the money'

机译:'把钱拿出来'

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Perhaps that's a little too forward when dealing with lenders; but you will win them over with a solid financial plan. The number one stumbling block for a Canadian bioenergy project is a lack of adequate financing. Previously, I've discussed the importance of a vision and a functioning team, but without adequate equity and capital investment, the dream could die. Credit strength questions are often left until the end of the project, with the hope that it will come together somehow. I've seen elaborate business plans without even a simple pro forma income and expense spreadsheet. Often there is no construction budget, cash flow timeline, or detailed breakdown of income sources. To launch a successful bioenergy project, you must start with a solid financial plan.
机译:与贷方打交道时,这可能有点太过向前了。但是您将通过可靠的财务计划来赢得他们。加拿大生物能源项目的第一个绊脚石是缺乏足够的资金。之前,我曾讨论过愿景和团队运作的重要性,但是如果没有足够的股权和资本投资,梦想就会死掉。信用强度问题通常会留到项目结束时,希望它能以某种方式结合在一起。我看过详尽的业务计划,甚至没有简单的备考收入和支出电子表格。通常没有建设预算,现金流时间表或收入来源的详细分类。要启动成功的生物能源项目,您必须先制定可靠的财务计划。

著录项

  • 来源
    《Greenhouse Canada》 |2011年第1期|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 农业科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号