...
【24h】

Wattle Dam burns fast and bright

机译:荆坝大坝燃烧迅速而明亮

获取原文
获取原文并翻译 | 示例

摘要

The gold is starting to roll in from Ram-elius Resources Ltd's Wattle Dam mine just outside Kambalda as a cutback to the open pit nears completion. The refurbished Burbanks gold plant has been processing low-grade ore since July and is primed for higher grade ore - starting at about 10 g/t gold and heading upwards - coming into the mix any time now. Completion of the cutback was three-quarters finished by the end of September. That means a portal to begin an underground decline should be opened before Christmas, which in turn provides for the extraction of Wattle Dam's main prize - ore grading in excess of 20 g/t from just 40m below the base of the open pit.
机译:黄金开始从Rambal-elius资源有限公司位于坎巴尔达郊外的Wattle Dam矿中滚滚而来,这是对露天矿的削减,即将完工。翻新后的伯班克斯金矿厂自7月以来一直在加工低品位矿石,并且已准备好用于品位更高的矿石-黄金起价约为10 g / t,然后向上上涨-现在随时可以混合。截止9月底,裁员工作已完成了四分之三。这意味着应该在圣诞节前打开一个开始地下开采的门户,这反过来又可以提取Wattle Dam的主要奖项-从露天矿底部仅40m处开采的矿石品位超过20 g / t。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号