首页> 外文期刊>Global refining & fuels today >Williams, Boardwalk Launch Bluegrass Pipeline Open Season
【24h】

Williams, Boardwalk Launch Bluegrass Pipeline Open Season

机译:威廉姆斯,木板路启动蓝草管道开放季节

获取原文
获取原文并翻译 | 示例
           

摘要

Bluegrass Pipeline LLC, a joint venture between Williams and Boardwalk Pipeline Partners LP, begins a binding open season on October 29 to determine industry commitments to natural gas liquids (NGLs) transportation capacity from the Marcellus and Utica shale plays to the petrochemical and export complex on the U.S. Gulf Coast. The first phase of the Bluegrass pipeline is being designed to provide customers with 200,000 barrels per day (b/d) of mixed NGLs takeaway capacity in Ohio, Pennsylvania and West Virginia, according to an October 24 joint announcement. In the second phase of the project, capacity will be increased to 400,000 b/d to meet market demand – by adding additional liquids-pumping capacity in particular.
机译:威廉姆斯和Boardwalk Pipeline Partners LP的合资企业Bluegrass Pipeline LLC在10月29日开始了一个具有约束力的开放季节,以确定行业对从Marcellus和Utica页岩到石化和出口综合体的天然气液体(NGLs)运输能力的承诺。美国墨西哥湾沿岸。根据10月24日的联合公告,Bluegrass管道的第一阶段旨在为客户提供俄亥俄州,宾夕法尼亚州和西弗吉尼亚州每天20万桶混合NGL的外卖能力。在该项目的第二阶段,产能将提高到40万桶/天,以满足市场需求-特别是增加额外的液体抽取能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号