...
首页> 外文期刊>Global refining & fuels today >Siemens: ‘Wrong Locations’ for Renewable-Power Installations Wasting Billions
【24h】

Siemens: ‘Wrong Locations’ for Renewable-Power Installations Wasting Billions

机译:西门子:可再生能源装置的“错误位置”浪费数十亿美元

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Siemens on May 15 slammed decisions by certain governments that sanction renewable-power projects in the “wrong locations,” wasting billions of euros. “Building and expanding renewable-energy installations in the wrong locations is costing ?45 billion [US$57.8 billion] in unnecessary investment,” according to Siemens. In contrast, establishing renewable-power systems in proper locations could deliver potential savings “on a magnitude of four to five times the annual investment in solar and wind-power plant construction in Germany,” according to the company.
机译:西门子在5月15日猛烈抨击某些政府批准在“错误地点”批准可再生能源项目的决定,浪费了数十亿欧元。西门子表示:“在错误的地点建造和扩展可再生能源装置将花费450亿英镑(578亿美元)的不必要投资。”相比之下,该公司表示,在适当的位置建立可再生能源系统可以节省潜在的成本,“相当于德国每年在太阳能和风能发电站建设上投资的四到五倍”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号