首页> 外文期刊>Global refining & fuels today >First Wind Starts Up 102-MW Wind Power Project in Utah
【24h】

First Wind Starts Up 102-MW Wind Power Project in Utah

机译:First Wind在犹他州启动102兆瓦风力发电项目

获取原文
获取原文并翻译 | 示例
       

摘要

Boston-based First Wind announced May 10 the start-up of power production from its 102-megawatt (MW) "Milford Wind Corridor Phase 2" project in Utah, supplying "green" power to southern California. The project features 68 GE turbines of 1.5 MW each, just north of the existing, 204-MW Milford Wind Corridor Phase I project. At 306 MW, the combined output of Milford I and II has the capacity to generate enough energy to power up to 64,000 residences.
机译:位于波士顿的First Wind宣布将于5月10日启动其位于犹他州的102兆瓦“ Milford Wind Corridor Phase 2”项目的发电,向南加州提供“绿色”电力。该项目以68台GE涡轮机为例,每台1.5 MW涡轮机位于现有204 MW米尔福德风道一期项目的北部。 Milford I和II的总输出功率为306 MW,有能力产生足够的能量来为多达64,000个住宅供电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号