...
首页> 外文期刊>Global refining & fuels today >GE Wins Contract for Southern California Edison Load-Shifting Project
【24h】

GE Wins Contract for Southern California Edison Load-Shifting Project

机译:GE赢得了南加州爱迪生负荷转移项目的合同

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

GE announced October 29 that it won a bid to provide a 500 kilowatt-hour battery-storage system for Southern California Edison’s load-shifting project at the Discovery Science Center in Santa Ana, Calif. The “Durathon” battery system and Princeton Power Systems (PPS) inverter control system “is engineered to shift 10% to 20% of the Science Center’s daily electrical load from peak hours to less expensive off-peak time periods,” according to GE. “The system also will provide backup power in the event of power outages.”
机译:GE于10月29日宣布,它已中标为加利福尼亚州圣安娜市发现科学中心的南加州爱迪生公司的负荷转移项目提供500千瓦时电池存储系统。“ Durathon”电池系统和Princeton Power Systems( GE表示,PPS逆变器控制系统“经过精心设计,可将科学中心的日常用电负荷从高峰时段转变为费用更低的非高峰时段,降低了10%至20%。” “该系统还将在断电时提供备用电源。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号