首页> 外文期刊>Global refining & fuels today >Big Canadian Diamond Mine Rejects Hydropower , Chooses Diesel Gen-Set Power
【24h】

Big Canadian Diamond Mine Rejects Hydropower , Chooses Diesel Gen-Set Power

机译:加拿大大型钻石矿拒绝水电,选择柴油发电机组发电

获取原文
获取原文并翻译 | 示例
           

摘要

Canada-based Stornoway Diamond announced July 4 that it has decided to employ diesel generator-set power rather than investing Cdn$173.6 million (US$170.4 million) in a 159 kilometer-long grid-power line connecting its Renard diamond mine to a Hydro-Quebec hydropower station. The proposed Hydro-Quebec powerline “has been designed to support multiple users, including potential mine development projects located to the south of Renard,” according to Stornoway.
机译:总部位于加拿大的斯托诺韦钻石公司(Stornoway Diamond)7月4日宣布,已决定采用柴油发电机组发电,而不是在一条长159公里的电网中投资1.736亿加元(约合1.704亿美元),将其雷纳德钻石矿连接至魁北克水电公司水力发电站。 Stornoway表示,拟建的魁北克水电公司“旨在支持多个用户,包括位于Renard南部的潜在矿山开发项目”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号