A recent utility study estimated the total cost of converting a natural gas-fired 350-MW combined cycle plant at USD22.5 million but concluded the syngas fuel is too pricey at present to warrant the investment. Heightened concern over natural gas price volatility and supply uncertainty has increased the interest of many gas turbine owner operators in the possibility of modifying combined cycle plants to burn syngas as a potential replacement fuel.
机译:近期的一项公用事业研究估计,转换天然气350兆瓦的联合循环电厂的总成本为2,250万美元,但得出结论,目前合成气燃料的价格太高,无法进行投资。人们对天然气价格波动和供应不确定性的关注日益增加,许多燃气轮机所有者的运营商对改型联合循环电厂以燃烧合成气作为潜在替代燃料的兴趣日益浓厚。