首页> 外文期刊>Gas Turbine World >Refinery IGCC plants are exceeding 90% capacity factor after 3 years - Steep learning curves for commercial IGCC plants in Italy show annual capacity factors of 55-60% in the first year of service and improvement to over 90% after the third year
【24h】

Refinery IGCC plants are exceeding 90% capacity factor after 3 years - Steep learning curves for commercial IGCC plants in Italy show annual capacity factors of 55-60% in the first year of service and improvement to over 90% after the third year

机译:炼油厂IGCC工厂在3年后超过90%的产能系数-意大利商业IGCC工厂的陡峭学习曲线显示,服务第一年的年产能系数为55-60%,第三年后提高至90%以上

获取原文
获取原文并翻译 | 示例
       

摘要

EniPower is commissioning a 250 MW IGCC plant that will burn syngas produced by gasification of residues at an adjacent Eni Sannaz-zaro refinery in north central Italy. Based on commercial experience with earlier plants, project engineers predict the annual capacity factor (measure of profitability) of the San-nazzaro plant should match if not outperform them, especially in the critical early years.
机译:EniPower正在调试一座250兆瓦的IGCC工厂,该工厂将燃烧意大利中北部相邻的Eni Sannaz-zaro精炼厂残渣气化产生的合成气。根据早期工厂的商业经验,项目工程师预测,如果不超过San-nazzaro工厂的年产能因子(获利能力的度量),则应与其相匹配,尤其是在关键的早期年份。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号