首页> 外文期刊>Gas processors report >Tudor, Pickering Puts Regency Stock on Hold Due to Perceived Capital Shortfall
【24h】

Tudor, Pickering Puts Regency Stock on Hold Due to Perceived Capital Shortfall

机译:都铎(Tudor),皮克林(Pickering)由于察觉到资金短缺而将摄政类股票搁置

获取原文
获取原文并翻译 | 示例
           

摘要

Anson Williams of Tudor, Pickering, Holt & Co. has placed Regency Energy Partners on hold because of the company's need for additional funding for capital projects and, possibly, to maintain distributions. Williams stated that while he still backs Regency's planned $1.1 billion expansion of its Haynesville Intrastate Gas System (GPR 10/8/08), the current economic climate is not looking at the project as enthusiastically.
机译:Tudor,Pickering,Holt&Co.的Anson Williams已将Regency Energy Partners搁置,因为该公司需要为资本项目提供更多资金,并可能维持分配。威廉姆斯表示,尽管他仍支持摄政集团计划以11亿美元的价格扩张其海恩斯维尔州内天然气系统(GPR 10/8/08),但当前的经济形势并未对该项目产生积极的影响。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号