HOW TO MANAGE CLAIMS, DISPUTES AND CONTRACT ADMINISTRATION IN MAJOR GAS PROJECTS

机译:如何处理大型天然气项目的索赔,争议和合同管理

获取原文
获取原文并翻译 | 示例
           

摘要

THIS ARTICLE WILL outline practices that can be used to address issues that arise during the project delivery phase and (where possible) avoid them developing into major disputes. CAUSES OF DISPUTES One of the principal causes of disputes is poor contract administration. Before a project commences, a significant amount of time and effort is spent drafting and negotiating the project contract. However once the project begins, the focus shifts to delivery of the project and administration of the contract itself can sometimes be forgotten. This can have serious ramifications. For example, non-compliance with a notice provision can be fatal to a contractor's claim.
机译:本条款将概述可用于解决在项目交付阶段出现的问题并(在可能的情况下)避免它们发展为重大纠纷的实践。争端的原因争端的主要原因之一是合同管理不善。在项目开始之前,需要花费大量时间和精力来起草和谈判项目合同。但是,一旦项目开始,重点就转移到了项目交付上,有时可以忘记合同本身的管理。这可能会产生严重的后果。例如,不遵守通知规定可能对承包商的索赔致命。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号